SupplyLoop
Site Build → Get paid

Run the site, prove the progress

Daily reports from the field — crew, quantities and photos — measured against the programme. Receipt and verify deliveries on site, then hand clean, evidence-backed progress to cash-flow reconciliation.

Daily reportscrew · quantities · photos
Progress vs programmeinstalled % per activity
Delivery verificationreceived & checked on site
The daily report

A day on site becomes a report.

Crew count, work done, photos and progress — captured in the field in minutes, and measured against the programme automatically.

app.supplyloop.ai/workspace/progress
Daily report — Villa, Al Barsha
Site walk · today
Filed from siteDPR ready
Crew on site0
Deliveries received3
Today’s progress0%
Site photos · 6
Work done today
Rebar fixing — level 2 slab18.4 t
Blockwork — grid C–F220 m²
MEP first-fix conduits1 zone
Progress vs programmeplannedactual
Substructure100%
Superstructure58%
Blockwork34%
Every day of work becomes a report — crew, quantities, photos and progress, measured against the programme.
Daily reports

File the DPR from the field, in minutes.

Capture crew, plant, quantities of work done, weather and site photos on the day. SupplyLoop assembles the daily progress report, snags and photos into a DPR you can share — no evening spreadsheet.

  • Crew and plant counts, work-done quantities and weather
  • Site-walk photos attached to the log and the activity
  • Snags raised with photos and tracked to close-out
  • One-tap “Generate DPR” assembles the day into a shareable report
See it for contractors
Daily progress report
Crew on site · 3 subcontractors24
Work logged · rebar, blockwork, MEP3 items
Photos · site walk6
Open snags · 1 raised today2
Progress

Measured against the programme, not guessed.

Capture installed progress per activity and SupplyLoop compares it to the plan. You see planned-vs-actual on every line, so slippage is visible the week it starts — and the programme reacts.

  • Installed-progress % captured per activity
  • Planned-vs-actual on every line of the programme
  • Slip on the critical path ripples to downstream work
  • Installed value rolls up for the claim
How the programme reacts
Installed progress
Substructure100%
Superstructure · plan 70%58%
Blockwork · plan 40%34%
MEP first fix · on slack42%
Deliveries

Receipt and verify materials on site.

When an order lands, receive it against the buy plan: confirm quantities, flag short or damaged loads, and attach a photo. The receipt ties the delivery back to the order and the activity it feeds.

  • Receive against the ordered quantity, on site
  • Flag short, over or damaged deliveries with a photo
  • Each receipt links to its order and the activity it feeds
  • What’s still to receive stays visible on the buy plan
See procurement
Deliveries received today
Rebar B500B, 16 mm — 18.4 tOrder SL-1042 · SuperstructureVerified
Solid blocks 200 mm — 6,400 pcsOrder SL-1043 · BlockworkVerified
Washed sand — 40 m³Order SL-1044 · short 4 m³, flaggedShort
The cash handoff

Real progress becomes a defensible claim.

Site progress feeds cash-flow reconciliation directly — so what you claim is backed by what you built.

Progress

Installed-progress per activity, backed by daily reports, photos and verified deliveries.

Certified

Claims reconcile against real progress — over-claim risk is flagged before it becomes a dispute.

Paid

Keep cash flow ahead of the work, with the claim, the progress and the money in one place — in AED.

For contractors

See the site loop on your own project.

We’ll walk a daily report, progress against the programme and a delivery receipt with you — then show the clean handoff to the claim.